CARDIFF, 19 November 2026 — Flooding between Rhoose Cardiff International Airport station and Bridgend is disrupting evening trains, Transport for Wales said.

Checked at 20:10 GMT (21:10 WAT), the operator’s notice said trains could run at reduced speed, with delays of up to 15 minutes. Services between Barry and Cardiff Central could also be cancelled in either direction.

TfW expected disruption until 22:00 GMT on Thursday, equivalent to 23:00 WAT. That is an estimate, rather than confirmation of normal service at that time.

Affected passengers can use First Bus routes 303 and 304 between Barry and Bridgend at no extra cost until the end of the day. TfW’s pay-as-you-go product is excluded: users changing to a local bus must tap out at their starting station within one hour of tapping in and buy a separate ticket before boarding.

Nigerian and other African travellers using this rail corridor should check their specific departure and leave additional time for onward connections. The notice concerns the railway; it does not establish that Cardiff Airport or its flights are closed.

Check TfW’s live service updates before setting off: https://tfw.wales/service-status/all-updates

Source & attributionTransport for Wales — current service updates, checked 19 November 2026 at 20:10 GMT / 21:10 WAT ↗Archive image provenance and licence — Dominic Nelson, 12 May 2023 ↗