LONDON, 26 November 2026 — Travellers using Heathrow face disruption on airport rail routes this morning while strike restrictions remove the Piccadilly line as an alternative, according to National Rail’s latest service notices.

At 07:54 GMT, National Rail said all lines between London Paddington and Hayes & Harlington had reopened following overrunning engineering works. Services were still recovering, with trains potentially cancelled or terminating before their destination. The notice expected disruption until 10:00 GMT; that is a recovery estimate, not confirmation that normal service has resumed.

The affected operators include the Elizabeth line, Heathrow Express and Great Western Railway. Heathrow Express was running a reduced service. For passengers starting between Shenfield and Stratford, the Elizabeth line advice was to change at Whitechapel for a Heathrow Terminal 4 service, with free transfers available between Heathrow terminals. Travellers should check their specific train and terminal before setting off.

Separately, National Rail’s 06:42 GMT strike update says the Circle and Piccadilly lines have no service throughout Thursday. Other Tube lines are expected to reduce services from 10:00, with disruption across the network from midday and no Waterloo & City service after noon. The notice says no Tube services are expected after 21:00.

Friday’s plan keeps the Circle, Piccadilly and Waterloo & City lines closed until noon. Other lines are expected to begin operating from about 07:00, with a normal network service anticipated around 18:00. These remain service forecasts and should be rechecked.

TfL’s advance notice, dated 23 November, says the Elizabeth line, DLR, London Overground, buses and trams are outside the Tube strike and may be busier. That strike distinction does not mean Heathrow rail services are unaffected by this morning’s separate engineering disruption.

For Nigerian and other African passengers with London arrivals, departures or connections, allow additional transfer time and confirm the whole journey. National Rail warns that journey planners may not fully reflect strike service levels; consult operator notices as well as departure boards.

Checked at 09:08 WAT / 08:08 GMT on 26 November. This report concerns ground transport access; it does not establish a Heathrow airport closure or flight cancellation.

Source & attributionNational Rail: Paddington–Heathrow rail recovery, updated 26 November at 07:54 GMT ↗National Rail: 26–27 November London Underground strike service plan ↗TfL: advance strike notice, 23 November 2026 ↗TfL: current service status ↗Archive photograph: KTo288, 27 March 2008 ↗Photograph licence: CC BY-SA 3.0 ↗